Some progress photos. The roof structure is a work of art.
Barley Sheaf, Truro
2 week review and all looks great and just in time for the warmer weather.
Dukes Head, Crawley Down
Another site starting this week. 2 weeks with the site open and then 2 weeks fully closed. Another quick turnaround
Barn Owl, Newton Abbott
The dust has settled, and the rooms are all but done apart from a few fabrics and some bed sheets. A great mix of the old and the new, keeping the original characteristics of the building in place.
Inn on the Shore
Works started today on another site in a great beach side location.
Oyster Catcher
The weather has been terrible the last two weeks, but we have managed to get a bit done outside. The gluelam frame is now complete and the external bar is taking shape.
Barley Sheaf, Truro
Another handover this week. Shame the weather made us a little late, but this new beer garden by the river looks great with a feast of colour, ready for the warmer months.
Coombe Cellars Revisted
Love coming back once the dust has settled. Coombe Cellars finished only two weeks ago and looks great now the bar is stocked and the tables fully dressed. All this with just 8 days of closure.
Barn Owl, Kinkerswell
Wow, the rooms at the Barn Owl look stunning. We are almost complete and the furniture is going in. Can’t wait to see it fully furnished. The quality of workmanship is nothing short of outstanding.
Oyster Catcher, Polzeath
The Oyster Catcher in Polzeath making progress this week. Steel frame completed, glue laminated timber frame erection starting this week and the bar fitted inside.